Výrobky
Football Ground Lighting Design
power: 50-1000w
Lumen: 150,000lm
High-quality Meanwell Driver
HIgh Power input 100-265V AC
Wide range of 15°, 30°, 40°x80°, 60°or 90°x135° beam angles
Waterproof Indicator: IP66 Housing
Warranty with 5 years
Product Introduction:

Product description:Football ground lighting design flood light, 2700K-6500 K, 50W-1000w. Benweilight manufacture a range of stadium flood lights to suit tennis/ football/softball/courts. LED Stadium Floodlights are great for installation on lighting towers and suitable for sport, airports and ports.
Specification:
| Item Name | Football ground lighting design flood light |
|
Model Code |
BW-FL-300W |
|
Input Voltage |
100-265V AC |
|
CCT |
2700K-6500K |
|
CRI |
Ra80 |
| Beam Angle | Optional |
|
Power Factor |
>0.95 |
| Certification | CE ROSH ISO9001 ISO9002 |
|
Finish Color |
Black |
| Lamp Body Material | Aluminum Alloy |
Features:
- Power: 50-1000w
- Lumen: 150,000lm
- High-quality Meanwell Driver
- HIgh Power input voltage: 100-265V AC
- With a wide range of beam angles
- Waterproof Indicator: 66
- Warranty with 5 years
Details Displays:








Test:

Application:

Packaging

If you are interested in our products or would like to know more about our company , you can feel free to clik here https://www.benweilight.com//
FAQ
1. Where is your target market, first?
As we have shipped our goods to the Middle East, Southeast Asia, South America, and Europe among other places, we are certain that we can satisfy the expectations of your market.
2. What is your MOQ?
It depends on the item. Typically, the MOQ is 1 unit.
3. How long does it take to produce a sample?
Usually 4–7 days. However it may take some time to build the mold if you want a unique sample.
4. How much will you be paying?
We often employ the T/T, there are three options.And other payment methods like L/C/paypal:
1) 30% advance payment; the final balance must be paid before shipping.
2) A 30% down payment, a 30% payment before shipping, and a 40% payment after receiving the B/L copy.
3. A 50% advance payment is required, with the remaining balance due three days after receiving the B/L copy.
But, if you choose alternative payment methods, it will depend on the size of your transaction.
5. How long does it take to deliver?
About a week period.
Populárne Tagy: football ground lighting design, China, suppliers, manufacturers, factory, buy, price, best, cheap, for sale, in stock, free sample










